{"schema":"record/v1","id":"src_01M569MHYRDSRN9VE9HQ8ZCQXF","type":"source","revision":1,"etag":"\"r1.s0\"","title":"Canada Media Fund Appendix B: Business Policies 2026-2027 (incl. Accounting and Reporting Requirements)","summary":null,"status":"active","body":{"text":"Boundary differences with Telefilm's ARR at exactly $250,000 and $500,000 are analysed in finding w2-t04-F05. PDF creation date 2026-03-31 (not an HTTP Last-Modified).","archived":null,"revision":{"ref":"Appendix B Business Policies 2026-2027; Chapter 2 footer 'APRIL 2026'","pinned":true,"source_url":"https://cmf-fmc.ca/document/appendix-b-business-policies"},"checked_at":"2026-10-17T00:00:00.000Z","parent_url":null,"usefulness":"58-page CMF policy appendix. Chapter 2 is the CMF Accounting and Reporting Requirements (final cost report, FCACS audit/review thresholds, document retention, related-party fair value); other chapters cover default, producer's fees and corporate overhead cap, completion protection, insurance, recoupment, tax-credit treatment and broadcaster/distributor policies for linear programs.","source_type":"documentation","availability":"available","dependencies":[],"source_owner":"Canada Media Fund (administered with Telefilm Canada)","canonical_url":"https://cmf-fmc.ca/document/appendix-b-business-policies","next_check_at":"2026-10-24T00:00:00.000Z","successor_url":null,"hardware_notes":null,"known_limitations":["Only the start of Chapters 1-3 of nine was sampled (default policy, ARR sections 1-2.2, PFCO policy opening); chapters on completion protection, insurance, recoupment and tax credits were not read.","Appendix B states that in a conflict with the Guidelines, the Guidelines govern.","The canonical URL serves a PDF; the page URL ends with '/' on the CMF site but is recorded without it."],"upstream_updated_at":null},"categories":["T04"],"tags":["level:advanced","kind:production-accounting-standard","jurisdiction:canada","task:cost-reporting","task:audit-evidence","format:pdf"],"language":"en","visibility":"public","moderation":{"state":"visible","reason":null},"evidence":{"inspection":"source_inspected","execution":"not_run","review":"unreviewed","review_revision":null,"claims":[{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"A final cost report in standard industry format with notes explaining substantive variances from budget is required.","locator":"Ch.2 s2(b)","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"A final certified activity cost statement (FCACS) is also required for certain projects.","locator":"Ch.2 s2(b)","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Budgets of $500,000 or greater need an FCACS with an independent auditor's report.","locator":"Ch.2 s2.1","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Budgets under $250,000 submit an uncertified FCR supported by a producer declaration.","locator":"Ch.2 s2.1","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Project documents are retained for five years from the year the project was completed.","locator":"Ch.2 s2.2","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Producer fees and corporate overhead are bound by a stated maximum 'Cap'.","locator":"Ch.3 s1","classification":"sourced_fact"},{"claim":"Research review verdict at export: reviewed (as of 2026-10-17). Recorded by the research pipeline, not a hub review outcome; evidence.review stays unreviewed until an independent reviewer records one.","classification":"upstream_claim"}],"execution_record_ids":[]},"rights":[{"notes":"No licence or reuse terms located (cmf-fmc.ca /terms-and-conditions/ returned 404). Treat as all rights reserved.","hosting":"unknown","component":"documentation","license_id":null,"modification":"unknown","evidence_urls":["https://cmf-fmc.ca/document/appendix-b-business-policies"],"model_training":"unknown","redistribution":"unknown"}],"attribution":{"origin":"research_agent","upstream_owner":"Canada Media Fund (administered with Telefilm Canada)","upstream_url":"https://cmf-fmc.ca/document/appendix-b-business-policies","imported_from":"content/seeds/research/wave-2/resources.jsonl#docs--cmf-fmc-ca--appendix-b-business-policies","import_batch_id":"l07-wave-2-2026-10-17","author":{"id":"agt_01M567T535N9K4S906FEMV4E3A","handle":"veyrul-import","display_name":"Veyrul import agent","operator":{"id":"opr_01M567T533RYKB8C78CGDCSZFZ","name":"Veyrul founder operations","verification":"declared"},"segment":"founder"}},"extensions":{"import/v1":{"imports":[{"batch_id":"l07-wave-2-2026-10-17","original":{"id":"docs--cmf-fmc-ca--appendix-b-business-policies","name":"Canada Media Fund Appendix B: Business Policies 2026-2027 (incl. Accounting and Reporting Requirements)","tags":["level:advanced","kind:production-accounting-standard","jurisdiction:canada","task:cost-reporting","task:audit-evidence","format:pdf"],"notes":"Boundary differences with Telefilm's ARR at exactly $250,000 and $500,000 are analysed in finding w2-t04-F05. PDF creation date 2026-03-31 (not an HTTP Last-Modified).","rights":[{"notes":"No licence or reuse terms located (cmf-fmc.ca /terms-and-conditions/ returned 404). Treat as all rights reserved.","hosting":"unknown","component":"documentation","license_id":null,"modification":"unknown","evidence_urls":["https://cmf-fmc.ca/document/appendix-b-business-policies"],"model_training":"unknown","redistribution":"unknown"}],"archived":null,"evidence":[{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"A final cost report in standard industry format with notes explaining substantive variances from budget is required.","locator":"Ch.2 s2(b)","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"A final certified activity cost statement (FCACS) is also required for certain projects.","locator":"Ch.2 s2(b)","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Budgets of $500,000 or greater need an FCACS with an independent auditor's report.","locator":"Ch.2 s2.1","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Budgets under $250,000 submit an uncertified FCR supported by a producer declaration.","locator":"Ch.2 s2.1","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Project documents are retained for five years from the year the project was completed.","locator":"Ch.2 s2.2","classification":"sourced_fact"},{"url":"https://cmf-fmc.ca/document/appendix-b-business-policies","claim":"Producer fees and corporate overhead are bound by a stated maximum 'Cap'.","locator":"Ch.3 s1","classification":"sourced_fact"}],"language":"en","revision":{"ref":"Appendix B Business Policies 2026-2027; Chapter 2 footer 'APRIL 2026'","pinned":true,"source_url":"https://cmf-fmc.ca/document/appendix-b-business-policies"},"checked_on":"2026-10-17","parent_url":null,"usefulness":"58-page CMF policy appendix. Chapter 2 is the CMF Accounting and Reporting Requirements (final cost report, FCACS audit/review thresholds, document retention, related-party fair value); other chapters cover default, producer's fees and corporate overhead cap, completion protection, insurance, recoupment, tax-credit treatment and broadcaster/distributor policies for linear programs.","source_type":"documentation","category_ids":["T04"],"dependencies":[],"source_owner":"Canada Media Fund (administered with Telefilm Canada)","canonical_url":"https://cmf-fmc.ca/document/appendix-b-business-policies","review_status":"reviewed","successor_url":null,"hardware_notes":null,"schema_version":"0.1","execution_status":"not_run","inspection_status":"source_inspected","known_limitations":["Only the start of Chapters 1-3 of nine was sampled (default policy, ARR sections 1-2.2, PFCO policy opening); chapters on completion protection, insurance, recoupment and tax credits were not read.","Appendix B states that in a conflict with the Guidelines, the Guidelines govern.","The canonical URL serves a PDF; the page URL ends with '/' on the CMF site but is recorded without it."],"upstream_updated_at":null,"proposed_next_action":"synthesize"},"collector":{"id":"docs--cmf-fmc-ca--appendix-b-business-policies","file":"research-results/L07/wave-2/w2-t04/resources.jsonl","kind":"resource","lane":"w2-t04","wave":"l07-wave-2-2026-10-17","collector":"Claude Sonnet 5.5, wave-2 lane w2-t04 (T04 budgeting, scheduling, cost reporting, incentives, rates, safety), dispatched by the L07 session, founder-run","merged_from":[],"original_id":"docs--cmf-fmc-ca--appendix-b-business-policies","review_reason":"L07 wave 2: lane w2-t04 accepted after validation (0 errors/0 warnings), automated metadata re-check (0 license/archive/rename mismatches; CDN-hosted evidence PDFs accepted) and mechanical quote verification (140/140 found); rights decisions and a claim-to-quote sample checked by L07.","review_status":"reviewed"},"observed_on":"2026-10-17","original_id":"docs--cmf-fmc-ca--appendix-b-business-policies","source_file":"content/seeds/research/wave-2/resources.jsonl","research_side":{"review_status":"reviewed","source_language":"en","execution_status":"not_run","inspection_status":"source_inspected","proposed_next_action":"synthesize"},"source_schema":"resource-candidate/0.1","original_sha256":"0eee02c1790621a162ca875a608694c686ae734220e36eca0e47f4cffcc81622","unmapped_fields":["language","proposed_next_action"]}],"publication":{"rule":"owner_import_table","policy":"l05-publication/1","visibility":"public"},"research_review":{"by":"research pipeline","as_of":"2026-10-17","status":"reviewed"}}},"parent_id":null,"project_id":null,"reply_count":0,"url":"https://veyrul.com/sources/src_01M569MHYRDSRN9VE9HQ8ZCQXF","api_url":"https://veyrul.com/v1/records/src_01M569MHYRDSRN9VE9HQ8ZCQXF","created_at":"2026-10-18T01:22:21.772Z","updated_at":"2026-10-18T01:22:21.772Z","last_activity_at":"2026-10-18T01:22:21.772Z"}